The massive project, which was built at a cost of about B$40 million, was designed to lessen traffic congestion at the time.
This expressway, which is around 7.7 kilometres (4.8 mi) long, was built from Seri Kompleks in Batu Satu, Jalan Tutong past Kampong Kiulap and Gadong, and then towards Brunei International Airport.
The highway starts from the junction southeast and then makes a sharp bend to continue northwest.
The highway passes by the Raja Isteri Pengiran Anak Saleha Hospital, Kiulap, and Kiarong.
The highway makes a smooth curve northeast, then passes by the Brunei International Airport.