This toll road connects the city of Surabaya (largest city in East Java) and Mojokerto Regency, in the west this toll road is connected with Kertosono–Mojokerto Toll Road.
Parts of the toll that has been operating is the 2.3-kilometre section IA (Waru–Sepanjang, inaugurated 27 August 2011[2]) as well as the 18.47-kilometre section IV (Krian–Mojokerto, inaugurated 19 March 2016[3]).
[4] Indonesian President Joko Widodo inaugurated Section 1B, 2 and 3 of the toll road on 19 December 2017.
[5] Thus the total length of the toll road now fully operational.
The exits on the Surabaya-Mojokerto toll are Waru, Sepanjang, WORR, Driyorejo, Krian, and Mojokerto.