[7] In designing the bridge, a process which took a total of 4 years, Araghian wanted it to "be a place for people to stay and ponder, not simply pass.
[4] Construction of the bridge started in 2010, using a total of 2000 tonnes of steel and 10000 cubic metres of concrete before it was finished in October 2014.
[4] Construction of the bridge over a large highway was described as a big challenge, with platforms and temporary tunnels built to ensure that nothing fell onto the road below.
[8] The complex steel structure has a dynamic three-dimensional truss[1] and the surface is curved with a varying width.
[8] Structural elements of the bridge use a latent geometrical order rotated and repeated in all three dimensions.