[1] Efforts are on to get the first unit of the NTPC Limited’s North Karanpura Thermal Power Station (3x660 MW), ready in 2021.
[2]North Karanpura Coalfield of Central Coalfields Limited, spread over 1,230 square kilometres (470 sq mi) in the southern part of the district, with spill over to neighbouring districts, and having coal reserves of 14 billion tonnes is among the biggest in India.
[6] NTPC Limited is constructing the 3 X 660 MW North Karanpura Thermal Power Station at Tandwa at an appraised current (2015) estimated cost of ₹ 14,366.58 crore (143,665,800,000).
[8][needs update] The North Karanpura Coalfield is spread across parts of Ranchi, Hazaribagh, Chatra and Latehar districts of Jharkhand covering an area of 1,230 km2.
This coalfield in the upper reaches of the Damodar Valley, has reserves of around 14 billion tonnes of coal, very little of which has been exploited.