A hydroelectric power station, with an installed capacity of 2.8 MW, was under construction in 2013 as part of the dam's structure.
The purpose of this plan is to produce 46.46 gigawatt hours of energy by controlling the flow of Sefidrud water with the Tarik dam power plant.
This park is located on the southern bank of the Sefid Rood River, near Tarik Dam.
One of the most beautiful sights of this park is a rainbow of dark green, red, yellow and purple colors in autumn.
Among the animals found in this climate, we can mention badger, jackal, forest turtle, red breast, and woodpecker.