The new company had capital of £70,000 (around £8.5 million in modern money), and made arrangements with the B&ER for the latter's trains to run to Crediton along the former's tracks.
Meanwhile, a proposal from business interests in Barnstaple was put forward in 1845 to build a new line connecting their town to the B&ER at Exeter.
However, these proposals were rejected by the Railway Commission under Lord Dalhousie, the so-called "Five Kings", who wished to defer the decision on linking Barnstaple to the national railway network in order to appraise an alternative proposal by the B&ER to construct a line that would run between Barnstaple and their station at Tiverton.
Meanwhile, the LSWR had long-term ambitions to challenge the GWR's dominance in the south-west, and they backed the rival Crediton option, installing John Locke as its engineer.
The GWR party failed to submit their plans in line with the standing orders, and so Parliament rejected them, authorising the Crediton route despite the recommendations of Dalhousie's commission and the preference of the Lord Lieutenant.
Given the departure of Buller, the E&CR directors conceded that an agreement with the B&ER would be impossible and ordered that the line be converted to the LSWR's narrow gauge and a station be constructed at Cowley Bridge.
Meanwhile, the commission also told the LSWR that they would not be permitted to construct a line linking the Cowley Bridge to Exeter, leaving the E&CR completely isolated.
He agreed to convert one of the two tracks on the Crediton line to broad gauge and lease the line to B&ER; in exchange, the B&ER agreed to construct a junction allowing trains to run from Crediton to Exeter St Davids, and Cowley Bridge station was never opened.
In the same year, new company the North Devon Railway (NDR) was formed to replace the financially failed TVER and construction started on the Crediton–Barnstaple section.
From 13 October 1996, services on the Tarka Line were operated by Wales & West (owned by Prism Rail) as part of heir franchise.
Crediton and Newton St Cyres are also served by Dartmoor line services to Okehampton.
[8] Since December 2019 most services have been operated by Great Western Railway Class 158 diesel multiple units.
A single service is extended beyond Exeter to Axminster on Monday to Friday evenings, and another operates to and from Exmouth in the May 2022 timetable.
Wessex Trains covered Class 150 2-car DMU number 150241 in coloured pictures promoting the line and named The Tarka Belle.
[26] The Barnstaple to Bideford route was mentioned in the Association of Train Operating Companies 2009 Connecting Communities: Expanding Access to the Rail Network report which recommended some closed lines that could be rebuilt to restore railway services to large communities.