Tarong Power Station

Coal is supplied via a conveyor from Meandu Mine, which is 1.5 kilometres (0.93 mi) away and is also owned by Stanwell.

[1] In 2024, Peter Dutton said he intends, if elected, to build one of seven government-owned nuclear power plants on this site, to be operational by 2035–2037.

Thus the accelerated construction program included not only bringing forward the dates, but also compressing the timeline.

[citation needed] Stanwell decided in 2021 to install a 150 MW grid battery at Tarong.

[7] The power station was the site for a pilot project which had been expected to reduce emissions by 1000 tonnes per year by collected carbon dioxide from flue gases.

The technology being trialled collected carbon dioxide and pumped it into waste water where it synthesised oil-rich algae into edible seaweed products or oils.