petrol engine could be employed to move the bridge, but should both systems fail it was possible to raise or lower the span manually using a winch mechanism.
The bridge was inaugurated by Prince Albert, Duke of York (later King George VI) and opened to traffic on 28 February 1934.
During the 1940s and early 1950s this would occur up to twice a day with an average of 800 vessels per year passing under it, despite staffing difficulties during the 1940s when men were away fighting.
In recent years it was repainted in its original green and some minor maintenance took place on the wire ropes and counterbalances which still take the majority of the bridge load.
This was planned to take six weeks but was completed behind schedule and over budget mainly because of the poor condition of the steelwork, the result of lack of maintenance.