[9] The line was to be 19+1⁄4 miles (31.0 km) long, and pass Scalby, Burniston, Cloughton, Stainton-dale, Robin Hood's Bay and Hawsker between Scarborough and Whitby.
[11][note 3] In October 1865 the NER opened a line between Castleton and Grosmont completing a route between Scarborough, Whitby and the ports of the north-east via the North York Moors.
A branch line was proposed, from the start at Crowdy Hill in Whitby connecting to the River Esk, where a wharf would be built.
[20] The company needed further acts allowing it to raise extra capital for, and to extend the timescale of the construction, and to make connections with lines in Whitby and Scarborough.
The junction layouts at both ends of the line (Prospect Hill in Whitby and Falsgrave in Scarborough) meant that trains had to reverse direction in order to gain access to the route.
The route itself was steeply graded in both directions (1 in 39 being the steepest) and its location along the coast meant that the rails were often slippery due to rain and sea mists.
This made driving conditions in bad weather extremely difficult and great skill was needed from the engine crews to prevent trains from stalling on the climbs.
This did much to resolve the reversal issues at Whitby and Scarborough but even these new trains were found to struggle with the gradients, and services were often disrupted when weather and sea conditions were poor.
Increasing road competition and a consequent drop in passenger usage outside of the peak summer seasons ultimately led to the route being proposed for closure in the 1963 Beeching Report along with both of the others serving Whitby.
There is also the possibility of introducing a visitor centre, cafe and pay and display parking to generate ongoing funding to maintain the route.