Titas Gas

The pipeline was constructed by East Pakistan Industrial Development Corporation.

[4] The Gas field is located some 100 km away to the direction of northern-east from capital city of Bangladesh, Dhaka.

The structure is an elongate north–south asymmetrical anticline measuring about 19x10 square km with a vertical closure of 500 m. As per latest official re-estimation, total recoverable gas reserve of Titas gas field is 4,740 billion cubic feet (134 km3).

At present maximum 475 million cubic feet (13,500,000 m3) of gas is produced daily from 16 wells of this field and processing through 5 nos.

You can help Wikipedia by expanding it.This article about a company or corporation involved in the energy industry is a stub.