The name Troller is a Brazilian adaptation of the English word Troll, which refers to a character of the Scandinavian legends that dwells forests and caves of Norway.
[4] In 1997, the company was bought by the entrepreneur Mário Araripe, who formed a partnership with Rogério Farias; the first gasoline-powered T4 was built.
[4] In 2005, a manufacturing plant opened in Angola to build the T4 for the African market.
[8] The state owned company expropriated the 129,000 m² of land that was for sale and seems to re-assemble electric hybrid vehicles, six models from three brands, starting in 2025.
The Plant where the assembly is planned in Horizonte was ceded by Adece to Comexport under a loan-for-use arrangement, where 3 years ago was ex Troller of ex Ford, meaning the forests behind with a total land of 550 000 m² is to be devasted near the water supply.