The current power station (Tušimice II) was commissioned in 1973–1974.
The power station consists of four generation units with a capacity of 200 MW each.
Tušimice II has a 300-metre (980 ft) flue-gas stack built in 1974.
The power station is supplied by lignite from the local Nástup–Tušimice Mines.
You can help Wikipedia by expanding it.This article about a power station is a stub.