[1] However, as an export design, it lacks some of the classified technologies of the Type 212 such as the non-magnetic steel hull that makes it difficult to detect using a magnetic anomaly detector.

[citation needed] The first submarine was built at HDW in Kiel, Germany and the rest at the Hellenic Shipyards Co. in Skaramangas, Greece.

The Republic of Korea Navy has ordered nine Type 214 submarines, designated as Son Won-Il class, to be built in Korea by Hyundai Heavy Industries and Daewoo Shipbuilding & Marine Engineering; three first batch models entered service since 2007, and six second batch models entered service from 2012.

Seapower magazine reported the Hellenic Navy refused to accept Papanikolis; additional problems noted were inadequate air-independent propulsion system output power, inappropriate periscope vibration, sonar flank array problems and seawater leakage into the ship's hydraulics.

Retired Rear Admiral M. Simionakis, who had been in charge of the Papanikolis program for the navy, told the interviewer that the manufacturer had made two attempts to fix a severe balance problem in the submarine, including shifting 21 tons of material from the top to the bottom, yet the vessel continued to heel as much as 46 degrees in sea trials.

Therefore, TKMS refused to deliver the boat to the Greek Navy until all debts were paid and Papanikolis remained in Kiel harbor.

[9] Despite this position by TKMS, the Hellenic Navy officers in charge of the submarine delivery have repeatedly stated there are problems with Papanikolis.

[citation needed] The second boat, Pipinos, was officially launched on 6 October 2014 and passed through Greek harbour acceptance trials in Elefsina.

[citation needed] On 21 September 2009, TKMS announced that the contract with the Greek Navy for all four submarines had been cancelled due to country's arrears of more than 520 million Euros.

[21] The South Korean Son Won-Il U214-class submarine (Hangul: 손원일급 잠수함, Hanja: 孫元一級潛水艦) is equipped with a SPHINX-D Radar System supplied by Thales Defence Deutschland GmbH.

[citation needed] In March 2008, it was reported in the media that the first Type 214 submarine of the Republic of Korea Navy suffered from defects related to excessive noise from the screw, according to anonymous sources.

[25] The Turkish Navy had commenced negotiations with HDW for six licence-built Type 214 class air-independent propulsion (AIP) submarines.

According to the Undersecretary for Defence Industries of the Turkish Government, these submarines would be produced with maximum local content at Gölcük Naval Shipyard in Kocaeli, Turkey.

The agreement was the largest defence acquisition project in Turkey at the time after the firm order for 116 F-35 fighters at a cost of in excess of $10 billion.

[28][29][30] Defence Minister Vecdi Gonul stated that "Turkish industrial participation in the project would be worth around 80 percent of the total value of the deal".

[citation needed] On 1 July 2011, the 2 billion euros order for six U 214 submarine material packages placed with ThyssenKrupp Marine Systems by Turkey entered into force with receipt of the advance payment.

The order was designated to contribute to securing employment at HDW in Kiel, as well as at many subcontractors in Germany and Turkey, for the next ten years.

However, Germany refused Greek demands to block delivering six Type 214 submarines to Turkey, as the manufacturer Thyssen was bound by contracts signed since 2002.

Greek submarine Papanikolis at the HDW's yard in Kiel, 2008
ROKS Son Won-il at Busan Naval Base , 2008