[8] The involvement of U2 was part of a deal in 2001 when the DDDA had acquired by compulsory purchase the site of U2's previous studio on Hanover Quay.

[citation needed] In October 2002, the DDDA announced an architectural design competition for the tower, initially to be 60 metres tall, which would house apartments and a penthouse recording studio for U2.

[10] It included the president of the Royal Hibernian Academy, the chairman and two other members of the DDDA, Dublin's City Architect, and Adam Clayton of U2.

[10][11] The Sunday Times later speculated that it might have been one by London practice 3W, after a campaign by Irish website archiseek.com led to six unidentified designs being located.

[13] This was in conjunction with the also-cancelled construction of the 120-metre Watchtower in the Point Village complex on the north bank of the Liffey, opposite the U2 tower.

[14][15] Minister for the Environment, Heritage and Local Government Dick Roche approved the DDDA's plans in July 2006.

[4] On 31 October 2008, the Dublin Docklands Development Authority announced that they were cancelling the construction plans due to the economic conditions at the time.

[5] On 25 November 2011, it was announced that U2 Tower land had been handed over to the National Asset Management Agency (NAMA) to settle debts.

[20] Developers Dunloe Ewart (subsequently taken over by Liam Carroll) had secured planning permission in 2000 for a 100-metre building on a site next to that of the U2 tower.

Dublin City Council refused to extend planning permission on Carroll's undeveloped site after it expired.

[14][21] Some residents of Ringsend accused the DDDA of "arrogance", claiming that extra revenue from two towers could fund social housing schemes in nearby areas.

[23] Concerns were expressed about a possible conflict of interest for U2 in the building tender process, when it emerged that the band were joint backers of Geranger.

[18] The building was primarily to consist of one-, two-, and three-bedroom apartments, with commercial premises on the ground and first floors, a two-level basement parking garage, and the penthouse.

The construction site at Britain Quay, June 2009
Site being cleared for construction in February 2008
Capital Dock now stands at the U2 Tower's site