[citation needed] The contract to build Jimmy Carter was to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 29 June 1996, and her keel was laid on 5 December 1998.
This section is fitted with an ocean interface for divers, remotely operated vehicles (ROVs), and special operation equipment; ROV handling system, storage, and deployment space for mission systems, and a pressure-resistant passage between the fore and aft parts of the submarine to accommodate the boat's crew.
Jimmy Carter has additional maneuvering devices fitted fore and aft that allow her to keep station over selected targets in odd currents.
Jimmy Carter began a transit from NSB New London to her new homeport at the Bangor Annex of Naval Base Kitsap, Washington on 14 October 2005 but was forced to return when an unusually high wave caused damage while the submarine was running on the surface.
In April and September 2017 Jimmy Carter returned twice to her homeport at Naval Base Kitsap-Bangor, flying a Jolly Roger flag, traditionally indicative of a successful mission.