On 2 January 1923, she shifted to SubDiv Zero, a division created for experimental work, and conducted winter maneuvers in the Caribbean Sea.
As part of a series of studies conducted by the United States Navy after World War I into the possibility of submarine-borne observation and scouting aircraft, S-1 became the experimental platform for this project late in 1923.
She was altered by having a steel capsule mounted abaft the conning tower; a cylindrical pod which could house a small collapsible seaplane, the Martin MS-1.
The first full cycle of surfacing, assembly, launching, retrieving, disassembly, and submergence took place on 28 July 1926, on the Thames River at New London.
She visited ports at Cristobal, Canal Zone and Coco Solo, Canal Zone; Cartagena, Colombia; Kingston, Jamaica; and Guantánamo Bay, Cuba, during these cruises, and spent the remaining months of those years operating along the New England coast, out of New London.
In poor condition after arriving in Durban, Natal, South Africa, she was often in repair and she was declared unseaworthy in January 1944.