USS Stamford (PF-95) was a United States Navy Tacoma-class frigate authorized for construction during World War II but cancelled before construction could begin.
Stamford originally was authorized as a patrol gunboat with the hull number PG-203, but she was redesignated as a patrol frigate with the hull number PF-95 on 15 April 1943.
She was assigned the name Stamford on 30 August 1943.
Plans called for Stamford to be built under a Maritime Commission contract by the American Shipbuilding Company at Lorain, Ohio, as a Maritime Commission Type T. S2-S2-AQ1 hull.
However, the contract for her construction for the U.S. Navy was cancelled on 31 December 1943 prior to the laying of her keel.