Uwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan.
It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation.
It supplies a 63.9 MW power station with water.
This article about a dam or floodgate in Tōhoku region of Honshu, Japan is a stub.
You can help Wikipedia by expanding it.This article about a Japanese power station is a stub.