In June 1964, the Vale of Glamorgan line between Barry and Bridgend was closed to passengers by the Beeching Axe, as set out in the report 'The Reshaping of Britain's Railways', but after 41 years, in June 2005, it was reopened to passengers with two new stations at Llantwit Major and Rhoose, and the disused bay platform (now '1A') at Bridgend was reinstated to act as a terminus for the Vale Line.
The Barry branch (sic) runs into Vale of Glamorgan territory at the River Ely viaduct 1½ rail miles from the Cardiff West zero.
Following the dramatic rationalisation that was to come about on South Wales railways after the 1960s, a large station board at Barry had announced "Change here for the Vale of Glamorgan Line."
Local traffic on the Vale of Glamorgan branch included that from the limestone quarries and the cement works at Aberthaw and Rhoose at the eastern end of the line.
Network Rail used three contractors: Mowlem for the permanent way; Carillion for signals and telephones; and Galliford Try for civil engineering, including the platforms.
The Vale of Glamorgan Council was responsible for the construction of the interchanges at Rhoose, Cardiff International Airport and Llantwit Major.
The official opening was performed by Andrew Davies AM, Welsh Assembly Government Minister for Economic Development and Transport, on 10 June 2005.
Arriva Trains Wales then ran a number of loco-hauled special services in conjunction with the Barry (waterfront) transport festival.
The Barry (BRY), Penarth (PTH) and Vale of Glamorgan (VOG) branches are currently operated by Transport for Wales (TfW) as part of the Valley Lines network.