It is a single track of 1,000 mm (3 ft 3+3⁄8 in) metre gauge) with a passing point but is unusual in that it has three intermediate halts (Corseaux, Chardonne and la Baume).
Nowadays, the line, which is electrically operated, is automatic, with a journey time of 10 minutes.
In the summer of 2009, the line was closed for major infrastructure work to be carried out and at the same time the two carriages refurbished and rebranded in "Golden Pass" livery.
The work, which was completed by 25 September 2009, and which involved the technical services of the Golden Pass group together with private enterprise cost just over CHF 4.8 million.
During the work a replacement bus service was provided (as far as possible) to cover for the funicular journeys.