On 10 July 1933, open regular air service on the route Moscow - Voronezh - Stalingrad on multi-seat aircraft K-5.
The plans for the renovation included the replacement cover and lengthening the runway to 2,600 meters (extension beyond 2,600 m was difficult, because on the one hand the airport borders on the federal highway M4, and on the other due to a ravine in front of the Voronezh Reservoir).
Replacement of perimeter fence, water and drainage systems, upgrading lighting equipment, reconstruction of the apron and taxiways and the airport complex.
Since 2010, after the end of major works on the runway, its technical characteristics allows handling Boeing 737 and Airbus A320 size airliners.
Currently, the reconstruction of the airfield complex of the second stage, which is expanding its capacity for reception and service of most modern passenger and luxury types of aircraft.