At this point, a facility called the Ware River Diversion exists to control the Quabbin Aqueduct.
This facility, consisting of a dam and hydraulic control systems, diverts the water from the Ware River into the aqueduct to either start a natural siphon or to store excess Ware River water in the Quabbin Reservoir.
If the aqueduct route from the Ware River Diversion to the Wachusett Reservoir is closed (the Wachusett-Coldbrook branch) and water diversion occurs, water flows from the Ware River, back down grade to the Quabbin Reservoir for storage.
This is typically done when the Wachusett Reservoir water level is increasing due to run-off from its own watershed.
If the aqueduct route from the Ware River Diversion to the Wachusett Reservoir is open, diversion of water from the Ware River water into both the Wachusett and the Quabbin Reservoir routes will start the siphon.