Montrealer (train)

[2] By the 1950s the route was rerouted through Alburg, Vermont, and in Quebec made stops at Cantic, St. Johns and St. Lambert before reaching Montreal.

During the Prohibition years the Washingtonian was a favorite target of U.S. federal agents who would board in St. Albans and search the train looking for illegal liquor.

[citation needed] Amtrak equipped the train with its own dedicated lounge car, outfitted with an electric piano, dubbed Le Pub.

[14] Despite the severity of the wreck, the death toll was low due to circumstances permitting quick rescue: area hospitals were at shift changes with doubled staff levels, a 2,400-person Vermont National Guard detachment with helicopters and a tank retriever was nearby preparing for training, and a large mobile crane was at a construction site in nearby Georgia, Vermont.

[14] The National Transportation Safety Board investigation faulted Amtrak for the lack of a proper cab radio and recommended changes in locomotive battery placement, improvements in baggage rack and seat cushion retention, and the use of shatterproof mirrors in passenger cars.

Senator Patrick Leahy of Vermont and Representative Silvio Conte of Massachusetts, Congress appropriated $5 million to rebuild the track.

[20] Only the section between Windsor and Brattleboro, Vermont, was transferred, however, leaving the Connecticut River Line between East Northfield and Springfield, Massachusetts, as an obstacle.

In 2012 the Federal Railroad Administration awarded $7.9 million to allow for the upgrade of the existing freight rail line between St. Albans and the Canada–US border.

On March 16, 2015, the United States and Canada signed an agreement that would allow for the establishment of a pre-clearance customs and immigration facility within Central Station in Montreal.

Before the Vermonter can be extended to Montreal the agreement must first be approved by Congress and the Parliament of Canada, and a preclearance facility must be constructed within Central Station.

The remaining hurdles to implementing the preclearance regime are an Order in Council in Canada, and a joint agreement between the two countries on construction of the facilities in Montreal and the service operating procedures.

The Montrealer in St. Albans, Vermont in 1965
The platform at Willimantic, Connecticut , used from 1991 to 1995