Accordingly, the MSLR and MR decided that its construction should be supported by both companies, and later on be formally added to the Sheffield and Midland Railway Companies' Committee (SMRCC), a body which was owned jointly by the MSLR and MR only.
37 chains (740 m) in length, it was authorised on 25 May 1900 and opened on 1 July 1900, creating a triangular junction at Glazebrook; by this means, trains from Wigan (and also St. Helens) could run to Warrington and Liverpool Central.
[10][11] On 4 August 1905 the GCR was authorised to absorb both the WJR and the LSHSL, which was formally carried out on 1 January 1906.
[3][12] In April 1884, there were seven trains in each direction per day, all running between Manchester Central and Wigan.
The Sunday service was of just two trains in each direction, calling at Urmston, Flixton, Irlam and all stations between Glazebrook and Wigan.