The initial line is due for completion in 2027, becoming Myanmar's first rapid transit system.
An initial proposal in 2015 from the Japan International Cooperation Agency (JICA) envisioned two underground rail lines in Yangon along with a light rapid transit network.
[3] In April 2019, JICA was announced to be providing assistance to the Burmese Ministry of Transport regarding the project, which was then confirmed to consist of elevated lines.
[5] The proposed line will begin at Hlaingthaya station, cross the Hlaing River south of Bayinnaung Bridge, before reaching Okkyin railway station along Parami Road.
Eventually the line will reach Toe Gyaung Ga Lay railway station.