The works is located in the vicinity of the railway station Yenakiieve and is 60 km from Donetsk.
[2] A trade blockade by Ukrainian activists during the War in Donbas has all but halted production since February 2017.
[3] On 1 March 2017 the separatist Donetsk People's Republic nationalized (along with all Ukrainian enterprises located in territory it controlled) the company.
Another blast furnace, Bessemer, and rail rolling shops were introduced in December.
1938 - First sintering plant was launched 1968 - The steel works received the Order of the Red Banner of Labour.