This was the genesis of the East Coast Main Line, but much remained to be done before the present-day route was formed, and the London terminus was altered to King's Cross.
George Hudson's business methods had always been uncompromising, and eventually serious irregularities in his financial dealings were exposed, which led to his disgrace and resignation from the chairmanship of the YN&BR in 1849.
The abundant mineral deposits in the area of County Durham and Northumberland led early on to the construction of waggonways to convey the heavy ores to watercourses for onward transit, or to other means of reaching a point of sale.
[4][5][6] Traffic levels did not reach expectations, some collieries on the route declining to use the line, and the heavy operating costs of the inclined planes lead to poor profitability.
The line was carried on three timber viaducts, including one 660 feet (200 m) long over the Sherburn Valley, and terminated at a new Ionic order station at Greenesfield in Gateshead.
The topography of the region presented obstacles: the Cheviot Hills stood in the direct line between Newcastle and Edinburgh, and a more gentle course following the low-lying coastal strip appeared to be unreasonably circuitous.
Viewed from Scotland it was by no means obvious that a connection to England had to pass through Newcastle, although any western route, through Carlisle, faced equally difficult terrain in the Scottish Southern Uplands.
When Viscount Howick became persuaded that his objections to the Newcastle and Berwick Bill in Parliament were unlikely to prevail, he instead proposed a rival line, the Northumberland Railway, which would pass clear of the estate, to the west.
The atmospheric principle was still a proposal for use on the South Devon Railway and the fatal operational problems which caused its removal after much expenditure on that line were still in the future.
Estimation of expected traffic volumes was fairly sophisticated by this time, and attention was drawn to the limited capacity to handle the anticipated demand, especially for goods trains.
The line opened on 18 June 1839, when two trains carried a total of 700 passengers on a return trip, followed by a celebration, which was interrupted by a violent thunderstorm that flooded the marquee.
It was extended to Tynemouth on 29 March 1847, and independent operation continued until the line north to Morpeth opened from a junction from Heaton on 1 July 1847.
Robert Stephenson selected the double-deck configuration to carry a roadway as well as the railway in preference to a side-by-side solution simply on the ground of the complexity of the pier foundations, as it was known that finding a hard bottom in the river was going to be difficult.
To avoid a clearance problem, the road deck was suspended below the arch ribs on hangers, an idea put forward by George Leather, 1787–1870, a Leeds engineer.
The last key on the High Level Bridge was driven by Mr. Hawks on 7th June, 1849; it was opened without any ceremony on August 14th, but was not brought into ordinary use until the following February.
We have opened the bridge thus far at the present time for the purpose of enabling those travelling to the great meeting of the British Association at Edinburgh to pass over it rather than over the temporary structure that had been used previously.
At this time too, the Newcastle and Carlisle Railway had come to terms with the fact that its alternative schemes were not to be progressed, so the central station would be jointly occupied by that company.
[52] In fact work on it was suspended in May 1849 and only resumed early in the following year, and due to financial strictures, some simplification was carried out, including abandonment of the portico.
The North British Railway had been subject to the frenzy of proposed schemes linking central Scotland with the developing English network and the Smith-Barlow Commission, referred to above.
However at the crucial time for presenting a parliamentary bill, the Caledonian was unable to generate sufficient subscriptions, and had to delay a year to the following session, giving the North British a lead.
[54] Although the two major river crossings (of the Tyne and the Tweed) were unbridged, in October 1847 a "through service" was advertised between Edinburgh and London via Berwick, Newcastle, York, Normanton and Rugby, taking 13 hours and 10 minutes.
It was to run from Tweedmouth, immediately south of the River Tweed near Berwick, to Kelso but strenuous objections from the Duke of Roxburghe prevented the intended approach to the town, and the terminus was at Sprouston, 4 miles (6 km) short, instead.
In the three years between 1844 and 1846 Parliament passed 438 acts giving permission for over 8,000 miles (13,000 km) of line, many in direct competition with existing railways.
[84] Early railway steam locomotives had no brakes, although some tenders were fitted with them,[85] and there were no weatherboards, the driver and firemen wearing moleskin suits for protection.
[98] With such as system it was difficult to keep accurate records, and Thomas Edmondson, a Newcastle and Carlisle Railway station master printed numbered card tickets, which were dated by a press first used in 1837.
[h][112] Work started in 1847 on the Royal Border Bridge, a 28 arch 2,160 feet (660 m) long viaduct engineered by Robert Stevenson, to cross the Tweed Valley that stood between the N&BR at Tweedmouth and the North British Railway at Berwick.
However, the deal was rejected by the shareholders of the Leeds Northern, who felt their seven per cent share of revenue too low and joint operation was agreed instead of merger with Harrison appointed General Manager.
[j] An 80-foot (24 m) deep cutting was dug at Neville's Cross and two timber and three stone viaducts were built, one with eleven arches through west of the City of Durham; passenger trains ran over the line from 1857.
[123] The former Newcastle & North Shields Railway line, together with later extensions through Tynemouth and the Riverside branch, was electrified in 1903, and passengers carried on the new trains from 1904.
[141] In 1888 it took 8+1⁄2 hours to travel from London to Edinburgh; this schedule was reduced by fifteen minutes after trains included restaurant carriages and the stop to allow passengers to eat en route was no longer necessary.