ALPAL-2

ALPAL-2 is a submarine telecommunications cable system in the Mediterranean Sea linking Algeria and the Spanish Balearic island of Majorca.

It has landing points in: It has a design transmission capacity of 160 Gbit/s, starting operation at 5 Gbit/s and a total cable length of 312 km.

It started operation in July 2002.