Africa-1

Africa-1 is a 10,000 km long international submarine telecommunications cable system from France to the Middle East, through Africa.

The cable system, consisting of 8 fiber pairs, has a design capacity of 96 Tbit/s and will be constructed by Alcatel-Lucent Submarine Networks (ASN)[1], utilizing their Alcatel 1620 Softnode transmission equipment to allow optical transmission rates between 100 and 400 Gbit/s per line card.

[2] A consortium of members signed an agreement in December 2018 for construction and maintenance of the cable.

Africa-1 will initially land in France, Kenya, Egypt, Djibouti, Saudi Arabia, United Arab Emirates and Pakistan.

[5][6] The next phase of the cable will include landings in Italy, Algeria, Tunisia, Sudan, as well as Yemen, Somalia, Tanzania and Mozambique.

Africa-1 Cable Map