The bridge provides a one-way route for road traffic across the Pétrusse, from Boulevard Royal, in Ville Haute, to Avenue de la Liberté, on the Bourbon Plateau in Gare.
[1] As of 13 December 2020, following the completion of the second phase of the construction of the city's new tramline, the bridge carries bidirectional tram traffic on its upper deck.
Although it is now over 100 years old, it is also known as the New Bridge (Luxembourgish: Nei Bréck, French: Nouveau pont, German: Neue Brücke) by people from Luxembourg City.
Rodange identified the future bridge's position, connecting with the main axis of Boulevard Royal, and drew up initial plans for a large stone viaduct.
In 1990, the Luxembourgish government launched an investigation into the state of the bridge and found that it showed signs of extensive damage, to both the stonework and steel.
Between September 2003 and August 2004, the central arches were strengthened by the addition of 258 prestressed steel bars, with a total force of 25,600 tonnes (251 MN).
[4] In concordance with the reintroduction of trams in Luxembourg, major redesign and renovation work occurred between 2014 and 2017, with a temporary bridge constructed parallel operating in the interim.