Arlberg railway

The 136.7 km line is a highly problematic mountain railway, in part because it is threatened by avalanches, mudslides, rockfalls and floods.

[2] As early as 1842 a railway over the Arlberg Pass was under discussion, as the British sought a rail connection for traffic from England to Egypt.

[3] Two years later, in 1847, Carl Ganahl - a textile industrialist from Feldkirch - decided to privately support construction of the railway, despite the many technical challenges involved.

Trade Minister Anton Freiherr von Banhans presented on March 22, 1872, at the Chamber of Deputies a draft law on the execution of the Arlberg railway at government expense for a total amount of 42 million florins.

[6][page needed] On September 21, 1884, the entire stretch of the mountain railway was completed, including the then single-track, 10.22 kilometres (6.35 miles) long Arlbergtunnel.

This electrification of the railway was carried out with a 15 kV, 16.7 Hertz system, allowing heavy trains to be pulled over the route once the tracks and supporting structures, including the Trisanna bridge in 1964, had been upgraded for the increased axle weights.

[10] Beginning with 2020, the stretch of track between Landeck-Zams and Ötztal will be selectively double-tracked, to increase capacity and improve the frequency of local services.

Arlberg railway tunnel construction (Western mouth)