Artemis IV

The mission will include the fourth use of a Space Launch System (SLS) launch vehicle, will send an Orion spacecraft with four astronauts to the Lunar Gateway space station, install a new module on the Gateway, and conduct the second lunar landing of the Artemis program.

[2] The mission will deliver and install the International Habitation Module (I-Hab) of the Lunar Gateway space station.

[6] Gateway is a small modular space station to be established in Near-rectilinear halo orbit (NRHO) in late 2024.

[9] The heavier total mass of the SLS Block 1B vehicle requires use of the Mobile Launcher-2 ground support equipment.

The NASA Office of Inspectior General (OIG) estimates the earliest that ML-2 will be available for Artemis IV is November 2026.

A large orange and white rocket launching off pad 39B at Kennedy Space Center beside a tall steel support tower
Rendering of the Space Launch System Block 1B launching
Orion spacecraft with outfitted interior (2021)
The Lunar Gateway Phase 1 orbiting the Moon