Baixada Santista Light Rail

On 29 May 2013, the construction of the first stretch of the LRT began after a ceremony with Governor Geraldo Alckmin, of President of Legislative Assembly of São Paulo Samuel Moreira, and other authorities.

[9] On 6 June 2014, Governor Geraldo Alckmin opened the first 5 stations of the LRT system, besides it was not operational: Mascarenhas de Moraes, São Vicente, Antônio Emmerich, Nossa Senhora das Graças and José Monteiro.

[10] The first test was made on 30 August 2014 in a stretch of 1 km (0.62 mi), between stations Nossa Senhora das Graças and José Monteiro.

[11] On 18 November 2014, the LRT supervised operation began, which consisted of a trip of 10 minutes between stations Antônio Emmerich and Mascarenhas de Moraes.

In the CCO, it's made the control of the operation, of the energy systems, of the electronic movement of the passengers (boarding and exit), and the security of stations and tracks.