[3][4] In the spring of 1992, the Turkish Prime Minister Süleyman Demirel proposed to Central Asian countries including Azerbaijan that the pipeline run through Turkey.
The declaration was witnessed by the United States Secretary of Energy Bill Richardson, who expressed strong support for the pipeline.
[10][11] The inauguration of the Georgian section was hosted by President Mikheil Saakashvili at the pumping station near Gardabani on 12 October 2005.
[16] It also traverses 3,000 roads, railways, and utility lines—both overground and underground—and 1,500 watercourses up to 500 metres (1,600 ft) wide (in the case of the Ceyhan River in Turkey).
Shareholders are: Azerbaijani, Georgian, Turkish, British, and American archaeologists began archaeological surveys 2000, sponsored by BP.
Several cultural artifacts were uncovered during the construction, resulting in a coordinated research of the archaeological sites such as Dashbulaq, Hasansu, Zayamchai, and Tovuzchai in Azerbaijan; Klde, Orchosani, and Saphar-Kharaba in Georgia; and Güllüdere, Yüceören, and Ziyaretsuyu in Turkey.
[28] The project has been criticised due to bypassing and regional isolation of Armenia,[29][30] as well as for human rights and safety concerns.
Former President Eduard Shevardnadze, one of the architects and initiators of the project, saw construction through Georgia as a guarantee for the country's future economic and political security and stability.
[32] Although some have touted the pipeline as easing the dependence of the United States and other Western nations on oil from the Middle East, it supplies only 1% of global demand during its first stage.
In the first half of 2007, a year after the launch of the pipeline as the main export route for Azerbaijani oil, the real GDP growth of Azerbaijan hit a record of 35%.
Turkey also benefits from an increase of commerce in the port of Ceyhan and other parts of eastern Anatolia, the region which had experienced significant decrease in economic activities since the Gulf War in 1991.
[35] To counter concerns that oil money would be siphoned off by corrupt officials, Azerbaijan set up a state oil fund (SOFAZ), mandated with using revenue from natural resources to benefit future generations, bolster support from key international lenders, and improve transparency and accountability.
[39] It will require constant guarding to prevent sabotage, though the fact that almost all of the pipeline is buried will make it harder to attack.
[18] Georgia formed a special purpose battalion that would guard the pipeline while the US watched over the area with unmanned aerial vehicles (UAVs).
On 5 August 2008, a major explosion and fire in Refahiye (eastern Turkey Erzincan Province) closed the pipeline.
[41] There is circumstantial evidence that it was instead a sophisticated cyber attack on the line's control and safety systems that led to increased pressure and an explosion.
[43] In September 2015, unrecognized Nagorno-Karabakh's defense minister, Levon Mnatsakanyan, was cited as saying: "This is a very serious financial resource for Azerbaijan and we need to deprive them of these means".
[47] Critics of the pipeline have pointed out it should be properly earthquake engineered because it travels through three active faults in Azerbaijan, four in Georgia and seven in Turkey.
"[49] As Borjomi mineral water is a major export commodity of Georgia, any oil spills there would have a catastrophic effect on the economy.
[54] A Czech documentary film Zdroj (Source) underscores these human rights abuses, such as eminent domain violations in appropriating land for the pipeline's route, and criticism of the government leading to arrest.
One of the central characters, Elektra King, is responsible for the construction of an oil pipeline through the Caucasus, from the Caspian Sea to the Mediterranean coast of Turkey.