Basketball Arena (London)

The arena was designed to be fully recyclable, and was dismantled in January 2013, the seating was sold to Barnet owner Tony Kleanthous to be used in the construction of The Hive Stadium.

[4] The possibility of subsequently deconstructing the arena and transporting it to Rio de Janeiro for the 2016 Summer Olympics was discussed, though the plan was shelved due to doubts from some Brazilian officials about its feasibility.

In late October 2009, preparatory work had begun on the site and Paisley-based Barr Construction would begin building the main arena in spring 2010.

The venue, a 30-metre-high rectangular volume (the equivalent of a seven-storey building) was made out of a steel portal frame and wrapped in 20,000 square metres of lightweight phthalate-free and recyclable PVC plastic.

The result was a dynamic illumination which, at night, transforms the white surface into a variety of saturated colours and strong silhouettes of the steel frame, creating the biggest light installation on the Olympic park.

The Basketball Arena interior