The Bazhong–Dazhou railway (Chinese: 巴达铁路) is a railway line in Sichuan, China.
Construction on the line began on 27 September 2009.
[1][2] At Bazhong railway station the line continues as the Guangyuan–Bazhong railway.
The line joins the Xiangyang–Chongqing railway north of Dushi railway station.
[3] The line is 128 kilometres (80 mi) long and has a maximum speed of 120 kilometres per hour (75 mph).