[2][3] Split into five phases, the combined Beacon solar facilities generate 250 MW of renewable energy for the Los Angeles Department of Water and Power (LADWP).
[3] The five phases of the project, fully completed in December 2017, include a total of 903,434 individual solar photovoltaic modules, mounted onto Nextracker single-axis tracking systems.
The solar thermal electric powerplant technology configuration raised significant concerns during the CEQA environmental permitting process.
[5] Among the many environmental concerns, the natural gas supply, the wastewater management and disposal, and the water supply during construction and during operation of the plant were concerns specific to the solar thermal technology.
[6] LADWP acquired the entire project, including the land and the environmental permitting for the site in 2012 as photovoltaic technology, which gained economic advantages over solar thermal and other technologies as a result of rapidly decreasing costs of solar photovoltaic modules.