Beech Creek Railroad

The proposed line was initiated with the backing of the New York Central Railroad, as part of a far-reaching strategy to ensure access to bituminous coal reserves.

[1] William H. Vanderbilt, president of the New York Central, responded to the challenge by developing a plan to enter the Clearfield Coalfield, hitherto the exclusive preserve of the Pennsylvania Railroad.

[3] The Fall Brook's rail network, extended down Pine Creek by a paper railroad called the Jersey Shore, Pine Creek and Buffalo Railway, would bring the New York Central's trains to Jersey Shore, on the West Branch Susquehanna River to the west of Williamsport.

[7] The Pennsylvania may have been influenced by a report from one of their civil engineers, Camille d'Invilliers, prepared in December 1883, which suggested that the Moshannon seam was being exhausted in the older collieries in the Philipsburg and Houtzdale area.

The Clearfield Bituminous Coal Company signed a contract to ship exclusively over the new railroad, and George Magee was appointed general contractor for construction.

[11] In the meantime, construction began on the 1,277 feet (389.2 m) Peale tunnel 8 miles (10 km) west of the summit, on the descent approaching Moshannon Creek.

2 miles (3 km) further west, the line crossed the creek on an iron viaduct 112 feet (34.1 m) high, opened for service on November 11, 1884.

Bond of the Beech Creek Railroad Company, issued 17. November 1915