Berkhamsted railway station

The original station building, opened in 1838, was located approximately 330 feet (100 m) south-east of the present structure, near the bridge onto Castle Street.

The armies of navvies, bricklayers and miners brought in from the English Midlands, Ireland, London and the North of England led to overcrowding in Berkhamsted and the rowdy behaviour of the labourers was said to have offended the genteel townsfolk.

Many landowners and turnpike trustees in Hertfordshire were opposed to the new railway line, and protest meetings were held at the King's Arms Hotel in Berkhamsted.

Although local opposition to the iron horse was led by noblemen such as the Earls of Essex, Clarendon and Brownlow, the railway line received Royal Assent in 1833.

[1] Led by chief engineer Robert Stephenson, works commenced in 1834 to build a high railway embankment on top of the ruined barbican and moat of Berkhamsted Castle.

The Great Central Railway also considered a proposal to extend the branch from Chalfont Road to Chesham further north to Berkhamsted and Tring.

The installation, which is enclosed by metal railings, was criticised for its appearance and prominent position in front of a Victorian railway station and in close proximity to the 11th-century Berkhamsted Castle.

In June 1997, Connex South Central began operating services between Gatwick Airport and Rugby via the Brighton and West London Lines that called at Berkhamsted with Class 319s.

[9][10] It was cut back to terminate at Milton Keynes in December 2000 before being withdrawn in May 2002 due to capacity constraints on the West Coast Main Line while it was upgraded.

The original Berkhampstead (sic) railway station as seen in 1838
Berkhamsted Station in 1961
Outline map of the possible future Crossrail extensions as recommended in the 2011 RUS, which include the WCML as far as Tring [ 14 ]