Bharat Heavy Electricals Limited (BHEL) is an Indian central public sector undertaking and the largest government-owned electrical/ industrial technology company.
Over time, it developed the capability to produce a variety of electrical, electronic, and mechanical equipment for various sectors, including transmission, transportation, oil and gas, and other allied industries.
The cumulative overseas installed capacity of BHEL manufactured power plants exceeds 9,000 MW across 21 countries including Malaysia, Oman, Iraq, UAE, Bhutan, Egypt, and New Zealand.
An improved focus on project execution enabled BHEL record its highest ever commissioning/synchronization of 15059 MW of power plants in domestic and international markets in 2015–16, marking a 59% increase over 2014–15.
With the all-time high commissioning of 15000 MW in a single year FY2015-16, BHEL has exceeded 170 GW installed base of power generating equipments.
The cumulative overseas installed capacity of BHEL manufactured power plants exceeds 9,000 MW across 21 countries including Malaysia, Oman, Iraq, UAE, Bhutan, Egypt, and New Zealand.
[15] Bharat Heavy Electricals Limited (BHEL) has achieved the unique milestone of supplying its 100th Space-grade battery to ISRO for its very important and critical mission, Chandrayaan 3.
These are manufactured at the Electronic Systems Division (ESD) of BHEL in Bengaluru, These batteries use various types of chemistry, including Nickel-Cadmium, Nickel-Hydrogen and Lithium-Ion.
[17] BHEL and NPCIL collaborated to develop 220-MW Kaiga 1 nuclear power plant, an indigenously designed pressurized heavy water reactor (PHWR).
[20] Source:[21] In 2009, has developed a new state-of-the-art 1,200 kV class Ultra High Voltage (UHV) transformer manufacturing facility at BHEL, Bhopal in Madhya Pradesh.The new UHV transformer block has a dust free and controlled atmosphere, air conditioned bays for winding works, pressurised bay for core building and final assembly, EOT cranes for lifting loads up to 450 tonne, isostatic pressing device for windings, air cushion transport system for movement of equipment & machinery and attached UHV laboratory for testing transformers.
[45] In 2023, Nuclear Power Corporation of India Limited (NPCIL) and Bharat Heavy Electricals Limited (BHEL) have entered into an MoU to jointly pursue business opportunities in the area of nuclear power plants based on Pressurized Heavy Water Reactor (PHWR) technology.
[46] In May 2023, Bharat Heavy Electricals Limited (BHEL), stated that the Indian Railways has set very ambitious targets and kept aggressive targets for upgradation.One of the significant goals set by the Indian Railways is the complete overhaul of signaling systems.As technology upgrades, BHEL will also upgrade and participate in the modernization process of the signaling system.
[48] The project has faced criticism for the environmental impact and the potential harm to the largest mangrove forest in the world.