The network of routes radiating from Bolton has remained largely unchanged to this day, the one exception being the line to Rochdale which closed on 5 October 1970.
The bridge connecting Newport Street with the rest of the town centre was also rebuilt, along with a large arch, which is clearly noticeable in the Bolton skyline.
In 2006 a proposal to refurbish the station toilets, waiting rooms, ticket office and platforms was rejected due to lack of funds.
It directly connects bus and rail services via a Skylink pedestrian footbridge, improving transport links, as well as access to the town centre.
It will also make use of innovative sustainable energy initiatives, including rainwater recycling to flush the toilets, solar panels, air source heat pumps and low-energy LED lighting.
[12] Network Rail refurbished the lifts for a second time in 2024 to improve the reliability of step-free access at the station, with work currently ongoing and expected to finish in the winter.
Another 15 day blockade took place between 12 and 27 August 2017 to permit further work at the station, including the reinstatement of platform 5 (as noted), erecting a new footbridge, installation of overhead wiring and signalling upgrades.
[16] The line reopened to traffic on 6 September 2017 upon completion of the repairs to the bridge supports and embankment and normal working resumed on all routes.
The electrification work at the station was due to be completed in time for the December 2017 timetable change, which would have seen a major revamp of the service pattern in operation.
This was due to unexpected problems with poor ground conditions in several locations, which meant that some 200 masts for the overhead wires could not be installed as planned.
[17] In order to complete the remaining work by the end of the year (both piling for the masts and the actual wiring), further weekend blockades were imposed by Network Rail, which were expected to continue until November 2018 (along with a nine-day line closure in late August).
The planned timetable revamp (including the return of Glasgow and Edinburgh trains and through services to south Manchester and Cheshire) have also had to be postponed until May 2019 as many of these improvements were dependent on the availability of electric rolling stock.
Some of the destinations served include Farnworth, Preston, Manchester, The Trafford Centre, Westhoughton, Bury, Blackburn and Leigh.