Brokdorf Nuclear Power Plant

The plant began operations in October 1986, and was decommissioned on December 31st, 2021 as part of the German phaseout of nuclear power.

The plant was built by a first-of-its-kind joint venture between PreussenElektra AG and Hamburgische Electricitäts-Werke, since 2002 part of Vattenfall.

[1] In May 2021, the 1,400 MW HVDC subsea power cable NordLink between Norway and Germany's Wilster substation near Brokdorf was opened.

[2] For a period of time, the closure of the plant forced Germany to rely on coal and natural gas, primarily from Russia, to generate electricity.

The plant is a pressurized water reactor with uranium dioxide fuel elements, which are used in degrees of enrichment of 1.9%, 2.5% and 3.5%.