Builyan, Queensland

[citation needed] Builyan Hall was opened in August 1950, built from local timbers with a dance floor of spotted gum.

[11] The Dawes Range Tunnel section of the Boyne Burnett Inland Rail Trail was opened on 11 September 2021.

They are hand hewn from the hard dense iron bark trees growing adjacent to the track.

[17] The Rail Trail is currently open as far as the Railway siding at Builyan in the Boyne Valley with Free camp area, fresh water and public ammenities.

There is a new shelter shed, history information signage, toilet block and elevated lookout over the old weir.