CTrain

All stations are accessible CTrain (previously branded C-Train) is a light rail system in Calgary, Alberta, Canada.

Much of the system functions as a high-capacity light metro, while in the downtown free-fare zone, trains run like a modern tram with a dedicated right-of-way.

Light rail rapid transit (LRRT) was chosen over dedicated busways and the expansion of the Blue Arrow bus service (a service similar to bus rapid transit today) because light rail has lower long-term operating costs and addressed traffic congestion problems.

In 1988, the Alberta Government purchased from Siemens two U2 AC units, the first of their kind in North America, for trials on both the Edmonton and Calgary LRT systems.

In July 2001, Calgary Transit brought the first of 15 new SD-160 LRVs into service to accommodate the South LRT Extension Phase I and increased capacity.

[28][29][30] In November 2007 city council approved purchasing another 38 SD-160 Series 8 LRVs to be used in conjunction with the West LRT extension (2012) and further expansions to the northeast (Saddletowne 2012) and northwest legs (Tuscany 2014).

These are new-generation train cars with many upgraded features over the original SD-160s including factory equipped air conditioning and various cosmetic and technical changes.

In September 2013, Calgary Transit ordered 63 S200 LRVs to provide enough cars to run four-car trains, and to retire some of its Siemens-Duewag U2s, which are nearing the end of their useful lifespans.

The front of the new cars is customized to resemble a hockey goalie's mask, and they include such new features as heated floors for winter and air conditioning for summer.

[37] Rides taken solely within the downtown are free; the rest of the network operates under a proof of payment system, with random fare inspections.

The routes merge and share common tracks on the 2 kilometres (1.2 mi) downtown transit mall on 7th Avenue South, which also allows buses and emergency vehicles.

The new stations have retained their existing names (with the exception of 10 Street W becoming Downtown West–Kerby in 2012); however, they may be shifted one block east or west, or to the opposite side of 7th Avenue.

The tunnel then runs under the Westbrook Mall parking lot, and the former site of the now-demolished Ernest Manning Senior High School.

Past 45th Street the line runs at grade, and approaching Sarcee Trail SW moves onto an elevated guideway that passes over the freeway.

[63] On October 5, 2009, the city council announced approval of a plan to put a portion of the West leg into a trench at 45th Street and 17th Avenue SW, a move welcomed by advocates who fought to have it run underground.

[68][69] On October 29, 2009, city council announced that the contract to construct the West LRT had been awarded to a consortium led by SNC Lavalin.

As for a possible underground leg in downtown (under 8 Avenue South), the cost of the project will be at least C$800 million (in 2012 dollars), but its priority has been lowered because there is no funding available for it.

[83] Discussions between the city of Calgary and the province continue with the goal of building the new light rail line instead of developing a BRT system as an interim measure.

[85] Three of the proposed downtown stations are expected to be built underground,[86] and the rest of the line will follow the 52 Street SE corridor from Douglasdale and McKenzie Towne to Auburn Bay (south of Highway 22X) and then wind its way through Health Campus (adjacent to the southeast hospital) and Seton.

[85] Because there was no funding available, the city laid out plans to build a transit way for the South East BRT known as SETWAY.

[79][80] The Airport Trail road tunnel, which opened on May 25, 2014, was built with room to accommodate a future two-track CTrain right-of-way.

[94] This system, dubbed "My Fare" was rolled out at the end of July 2020, but faced issues at launch such as the incompatibility with Apple's iOS devices.

[95] In addition to numerous tunnels to allow trains to pass under roadways, geographic features, and mainline railways, there are other notable underground portions of Calgary's CTrain system.

As the population of metropolitan Calgary increases and growing suburbs require new lines and extensions, the higher train volumes will exceed the ability of the downtown section along 7th Avenue S to accommodate them.

Many CTrain passengers travel to and from suburban stations on feeder bus routes that wind their way through surrounding neighbourhoods.

Another popular option is a park and ride lot, in which commuters drive or bike to a station by car or bicycle and then transfer to a CTrain to complete their journey.

Costs were controlled during construction and operation of the system by going with the lowest bidder and using relatively cheap, commercially available technology without regard for "buy Canadian" policies.

Transit police check passenger tickets at random, and fines are set at a level high enough that those who are caught pay the costs for those who evade detection.

Staffing costs were kept low by employing a minimum number of workers, and because the system is all-electric (wind powered) it can run all night with only 1 driver per train and 2 people in the control room.

The downtown 7th Avenue transit way is limited to trains, buses, and emergency vehicles, with private cars prohibited.

69th Street station entrance.
Older Ctrain model crossing the Bow River.
CTrain in the 8-stop tramway-style free-fare zone in Calgary's downtown financial district.
Interior of a Siemens S200 CTrain.
A ticket purchased from a CTrain station.
Calgary Light Rail System Map as of 2023
West LRT construction over Bow Trail
Proposed route extensions and Green Line (North-Central and Southeast LRT)
Capital transit projects for the future Calgary rapid transit network. Map based on LRT Network Plan (2008), BRT Network Plan (2011), Route Ahead Plan (2013), and other City documents.