Construction began in early 2013 and was completed the same year.
Designed and constructed by U.S. thin-film manufacturer First Solar, the plant uses nearly 2.3 million CdTe-PV modules.
Campo Verde Solar was acquired in April 2013 by Southern Power and Turner Renewable Energy.
[1] First Solar acquired the project in 2012 from US Solar Holdings LLC, which had developed the project and negotiated the 139 MW PPA with SDG&E.