The site has been rehabilitated and its tailings facility (shared with the Stanrock Mine) is currently undergoing environmental monitoring by Denison Environmental Services.
[1][2] The site was in operation from 1957 to 1960, during which time it produced 2.6 million tonnes of ore.[3] The property was staked by Carl Mattaini and owned by Can-Met Explorations Limited.
[4] In 1957, eleven holes were diamond drilled, each drilling found ore-bearing conglomerate averaging 16 feet thick.
[4] In 1960, Can-Met Explorations Limited merged with Consolidated Denison Mines Limited into Denison Mines Limited and the mine stopped operating.
[4] The production value of the mine by year was:[5] Total $37.59m