Cavendish Bridge

An earlier point for the ferry was also used and although the exact site is unknown, it was thought to be in the reach of the river between the bridge and Derwent Mouth.

During this period the unstable gravel bed of the Trent was affected by a succession of large floods which meant that the river shifted its course significantly during this time, demolishing the bridges and a Norman mill weir as well.

The Wilden crossing point was used in these Acts, as Shardlow only later grew into an inland port and village on the Derbyshire side of the river.

[4] The delays and inconvenience of using the ferry on what had become a busy turnpike route, led to calls for changes to be made, and the first meeting to discuss the bridge was held at the nearby Old Crown Inn in 1758.

[1] The five arch masonry bridge that was subsequently built was designed by James Paine, using sandstone transported down river from the quarry at Weston-on-Trent.

The Toll charges - these stones were removed when the old bridge was demolished and now stand by the old road, near Shardlow .