The weir is located 14 kilometres (8.7 mi) northwest of Beaudesert, and 5 kilometres (3.1 mi) southwest of Jimboomba and is connected to the Wyaralong Dam on Teviot Brook and the Bromelton Offstream Storage facility.
The project was completed in December 2007 at a cost of A$18.5 million and provides up to 11 megalitres (390×10^3 cu ft) of water per day.
In conjunction with the South Maclean Weir and water treatment plants, the Cedar Grove Weir acts as a pumping pool for captured releases from Wyaralong Dam located upstream;[2] and provides immediate supplies to the Beaudesert region.
The weir also connects to the regional South East Queensland Water Grid.