The Changsha–Ganzhou high-speed railway is a planned high-speed railway in China.
[1] The line will be 420.9 kilometres (261.5 mi) long and have a design speed of 350 kilometres per hour (220 mph).
[2] It will be part of the Xiamen–Chongqing corridor[3] and will be completed and operational within December 2026.
This People's Republic of China rail-related article is a stub.
You can help Wikipedia by expanding it.