The line adopts elevated construction and stops at twelve stations.
The shipment was carried out by land directly from INKA factory in Madiun, East Java.
For the time being, the train has been parked near Harjamukti Station; considering that the LRT depot construction in Jatimulya, Bekasi has not yet been completed.
[13] In a section from Cawang Station to TMII Station, the route follows the east side of the toll road; tracks are made at grade because it is close to the approach zone of Halim Perdanakusuma Airport.
[14] The track ends at Harjamukti as a pit stop, although all trains of the system have their depot in Jatimulya, part of the Bekasi Line.
Dukuh Atas BNI Sudirman BNI City Halim (Planned) Dukuh Atas Galunggung (PT) Kuningan (Planned) Cikoko Interchange station to Cawang Shuttle bus to Taman Mini Indonesia Indah.